PanPan MarineUNDERWATER SYSTEMSPlan your project

LONG DISTANCE / TUNNEL

AD-400

Built around the demands of the long run.

A specialist platform for long-distance inspection of flooded water tunnels, combining a tethered vehicle with project-specific sensing and tether management.

Get a configuration & quote
Boya Gongdao AD-400 Tunnel inspection ROVManufacturer product rendering · Boya Gongdao

TECHNICAL STARTING POINT

Key specifications.

Vehicle weight
300 kg
Depth rating
1,000 m
Official-site maximum range
5 km
Dimensions
1,600 × 900 × 548 mm
Forward camera
4K
Rear camera
1080p
Power
External tethered supply

Manufacturer brochure figures unless explicitly labelled official-site. Confirm the configuration and current version before purchase.

Manufacturer product page

Tasks to assess

  • Flooded headrace and water-conveyance tunnel assessment
  • Long-distance projects with an engineered entry and recovery plan
  • Projects needing a coordinated vehicle, tether and sensing package
Read the application guide

Configuration checks

  • Review tunnel geometry, bends, elevation profile and obstacles.
  • Confirm flow limits, tether drag and retrieval arrangements.
  • Agree position referencing and acceptance criteria before the mission.

COMPLETE SYSTEM

Specify more than
the vehicle.

The official website states a maximum operation distance of 5 km; the supplied brochure lists 5.5 km. The deliverable range must be confirmed against the supplied version and project conditions.

Confirm in the delivered scope

  • Vehicle and installed payload
  • Control station and software functions
  • Tether length, reel and power supply
  • Selected tools, sensors and deployment equipment
  • Transport cases, spares, manuals and training

Standard, optional and custom items must be listed separately in the quotation.

PROCUREMENT

Prepare the next review.

Agree the site conditions, acceptance test, delivery scope and support responsibilities. Product names and rated figures alone are not a project specification.

AD-400 starting brief

Download a concise summary of the specifications and project questions shown here. This is a selection aid, not a factory-approved datasheet.

Download product brief

Review training, spares & support

FROM TASK TO CONFIGURATION

Bring your project into focus.

Share the task, site conditions and required results. Build a clear brief for system selection.

Plan your project