PanPan MarineUNDERWATER SYSTEMSPlan your project

WATER INFRASTRUCTURE / UNDERWATER ROBOTICS

See deeper.
Work smarter.

Inspection ROVs and robotic maintenance equipment for the places your infrastructure depends on.

AD-400 / TUNNEL INSPECTION
Boya Gongdao AD-400 Tunnel inspection ROV
Long-distance capabilitySite-specific configuration
Industrial inspectionFlooded water tunnelsSubmerged cleaning & dredging

START WITH THE TASK

One environment.
Different challenges.

Depth, access, visibility and the required result define the system. Start with the work your team needs to complete.

THE EQUIPMENT

A system for the job.

Compare the equipment
Boya Gongdao R-30 Inspection ROV
Inspection ROV

R-30

A tethered inspection ROV for visual assessment of submerged structures, with payload and sensor selection matched to the task.

View equipment
Boya Gongdao R-45 Inspection ROV
Inspection ROV

R-45

A tethered inspection platform with a higher brochure payload than the R-30, for projects needing additional sensing or tooling.

View equipment
Boya Gongdao AD-400 Tunnel inspection ROV
Tunnel inspection ROV

AD-400

A specialist platform for long-distance inspection of flooded water tunnels, combining a tethered vehicle with project-specific sensing and tether management.

View equipment

MANUFACTURER EXPERIENCE / CHINA

Engineering with
real project context.

The manufacturer’s brochure describes long-distance tunnel inspection and submerged intake cleaning in Chinese hydropower infrastructure.

Use these project references to start a technical discussion. Confirm the original configuration and conditions before applying the evidence to another site.

Explore manufacturer cases
AD-400 / WATER TUNNEL

Long route.
Controlled access.
Planned recovery.

See the task, system and project-review questions behind the manufacturer reference.

Read the project reference

FROM BRIEF TO DELIVERY

The equipment is one
part of the decision.

01

Define the task

Identify the structure, site conditions and required outputs.

02

Select the configuration

Review the vehicle, sensing, tether and support equipment.

03

Verify the package

Agree technical evidence, testing and commercial responsibilities.

04

Prepare deployment

Confirm training, spares, delivery and recovery arrangements.

FROM TASK TO CONFIGURATION

Bring your project into focus.

Share the task, site conditions and required results. Build a clear brief for system selection.

Plan your project